How we generally fit a new kitchen:
- Strip out existing kitchen
- Put down new flooring if required
- Plumb in sink & get water back on!
- Fit base units
- Fit bridging units
- Fit oven and other accessories
These jobs take approximately 1-2 weeks depending on size and finish ie. tiling etc.
How we generally fit a new bathroom:
- Strip out old bathroom
- Remove old tiles
- Replaster whole room
- Put new floor down
- Fit the new suite on-top (rather than cutting around it)
- Tile & Grout
These jobs take approximately 1 week, depending on size & finish.